Ku-ring-gai Local Planning Panel Meeting
TO
BE HELD ON Monday, 17 February 2025 AT 9:45AM
BY ZOOM CONFERENCING
This meeting will be live streamed – click on the link below at 12:30pm
on 17 February 2025 to watch the live stream
IMPORTANT
Any persons speaking at a Local Planning Panel meeting, are advised that their voice and personal information (including name and address) will be recorded as part of the meeting and made publicly available on Council’s website via live stream and on-demand access (except any part of the meeting that is held in closed session). Accordingly, you must ensure that your address to the Panel is respectful and that you use appropriate language and refrain from making any defamatory statements or discriminatory comments.
Ku-ring-gai Council does not accept any liability for statements, comments or actions taken by individuals during a meeting of Ku-ring-gai Local Planning Panel. People connecting to this meeting by conferencing technology are reminded that under the Local Government Act 1993, the recording of meetings by a member of the public using any electronic recording device, including a mobile phone or video camera, is not permitted. Any person found recording without the permission of Council may be expelled from the meeting.-
Agenda
** ** ** ** ** **
NOTE: For Full Details, See Council’s Website –
www.krg.nsw.gov.au under the link to business papers
DECLARATIONS OF INTEREST
GENERAL BUSINESS
GB.1 72 Ridge Street, Gordon – Torrens subdivision & new garage 4
File: EDA0365/24
Torrens title subdivision of one lot into two, construction of a new garage, driveway works to an existing front fence and tree removal
PURSUANT TO SECTION 4.16(1) OF THE ENVIRONMENTAL PLANNING AND ASSESSMENT ACT, 1979
A. THAT the Ku-ring-gai Local Planning Panel, exercising the functions of Ku-ring-gai Council, as consent authority, under Section 4.16 of the Environment Planning and Assessment Act 1979, is satisfied that the request submitted under Clause 4.6 to vary the minimum lot size development standard contained in Clause 4.1(3) of KLEP 2015 has met the requirements of Clause 4.6(3). The Panel is also of the opinion that strict compliance with the development standard is unreasonable or unnecessary in the circumstances of the case and that there are sufficient environmental planning grounds to justify the variation to the development standard.
B. THAT the Ku-ring-gai Local Planning Panel, exercising the functions of Ku-ring-gai Council, as consent authority, under Section 4.16 of the Environment Planning and Assessment Act 1979, being satisfied that the proposed development would be in the public interest, grant development consent to eDA0365/24 for Torrens title subdivision of one lot into two and construction of a new garage, works to existing front fence and tree removal at 72 Ridge Street Gordon, subject to conditions contained in the Development Assessment Reports (Attachment A1). Pursuant to Section 4.53 of the Environmental Planning and Assessment Act 1979, this consent lapses if the approved works are not physically commenced within five years of the date of the Notice of Determination.
GB.2 100 Eton Road, Lindfield – Upgrade to Telecommunications facility 109
File: EDA0318/24
Upgrade of telecommunications facility
THAT the Ku-ring-gai Local Planning Panel, exercising the functions of Ku-ring-gai Council, as the consent authority, pursuant to Section 4.16 of the Environment Planning and Assessment Act 1979, being satisfied that the proposed development would be in the public interest, grant development consent to eDA0318/24 for upgrade the existing telecommunications facility at 100 Eton Road, Lindfield, subject to conditions contained in the Development Assessment Report (Attachment A1). Pursuant to Section 4.53 of the Environmental Planning and Assessment Act 1979, this consent lapses if the approved works are not physically commenced within five years of the date of the Notice of Determination.
GB.3 Planning Proposal for 77 Kulgoa Road Pymble 185
File: S14501
To refer the Planning Proposal for 77 Kulgoa Road, Pymble to the KLPP for advice as required by the Local Planning Panels Direction – Planning Proposals issued by the Minister for Planning under Section 9.1 of the Environmental Planning and Assessment Act 1979.
Recommendation:
That the KLPP advise Council that the Planning Proposal should proceed to Gateway Determination, subject to amendments.
GB.4 Planning Proposal for 40 Dumaresq Street Gordon 493
File: S14341
To refer the Planning Proposal for 40 Dumaresq Street, Gordon to the KLPP for advice as required by the Local Planning Panels Direction – Planning Proposals issued by the Minister for Planning under Section 9.1 of the Environmental Planning and Assessment Act 1979.
Recommendation:
That the KLPP advise Council that the Planning Proposal should proceed to Gateway Determination, subject to amendments.
** ** ** ** ** **
Ku-ring-gai Local Planning Panel Meeting - 17 February 2025 |
GB.1 / 1 |
|
|
Item GB.1 |
EDA0365/24 |
development application
Summary Sheet
Report title: |
72 Ridge Street, Gordon – Torrens subdivision & new garage |
ITEM/AGENDA NO: |
GB.1 |
KLPP referral criterion: |
A greater than 10% departure from a development standard. |
w
Purpose of Report
To determine Development Application No eDA0365/24 for 72 Ridge Street, Gordon.
This application is reported to the Ku-ring-gai Local Planning Panel for determination as it proposes a departure from a development standard in excess of 10% in accordance with the Minister’s S 9.1 Local Planning Panels Direction.
PURSUANT TO SECTION 4.16(1) OF THE ENVIRONMENTAL PLANNING AND ASSESSMENT ACT, 1979
A. THAT the Ku-ring-gai Local Planning Panel, exercising the functions of Ku-ring-gai Council, as consent authority, under Section 4.16 of the Environment Planning and Assessment Act 1979, is satisfied that the request submitted under Clause 4.6 to vary the minimum lot size development standard contained in Clause 4.1(3) of KLEP 2015 has met the requirements of Clause 4.6(3). The Panel is also of the opinion that strict compliance with the development standard is unreasonable or unnecessary in the circumstances of the case and that there are sufficient environmental planning grounds to justify the variation to the development standard.
B. THAT the Ku-ring-gai Local Planning Panel, exercising the functions of Ku-ring-gai Council, as consent authority, under Section 4.16 of the Environment Planning and Assessment Act 1979, being satisfied that the proposed development would be in the public interest, grant development consent to eDA0365/24 for Torrens title subdivision of one lot into two and construction of a new garage, works to existing front fence and tree removal at 72 Ridge Street Gordon, subject to conditions contained in the Development Assessment Reports (Attachment A1). Pursuant to Section 4.53 of the Environmental Planning and Assessment Act 1979, this consent lapses if the approved works are not physically commenced within five years of the date of the Notice of Determination.
Bonnie Yue Senior Development Assessment Officer |
Selwyn Segall Team Leader - Development Assessment |
Shaun Garland Manager Development Assessment Services |
Michael Miocic Director Development & Regulation |
Attachments: |
A1 |
Development Assessment Report |
|
2024/340786 |
|
A2 |
Location Sketch |
|
2025/028010 |
|
A3 |
Zoning Sketch |
|
2025/028014 |
|
A4 |
Amended Architectural and Subdivision Plans |
|
2024/379816 |
|
A5 |
Stormwater Management Plans |
|
2024/379814 |
|
A6 |
Amended Landscape Plans |
|
2024/379815 |
|
A7 |
Clause 4.6 Variation Request- Minimum Lot Size |
|
2024/293575 |
|
A8 |
Survey Plan |
|
2024/293569 |
Ku-ring-gai Local Planning Panel Meeting - 17 February 2025 |
GB.2 / 1 |
|
|
Item GB.2 |
EDA0318/24 |
development application
Summary Sheet
Report title: |
100 Eton Road, Lindfield – Upgrade to Telecommunications facility |
ITEM/AGENDA NO: |
GB.2 |
Application No: |
eDA0318/24 |
ADDRESS: |
100 Eton Road, Lindfield |
Ward: |
Roseville |
description of proposal: |
|
Applicant: |
Max Peel (Aurecon Group Pty. Ltd. on behalf of Telstra Corporation Limited) |
Owner: |
NSW Department of Education |
Date Lodged: |
28 August 2024 |
submissions: |
Fifteen submissions |
assessment officer: |
Raymond Law |
Recommendation: |
Approval |
KLPP referral criterion: |
Contentious development in respect of which 10 or more unique submissions, by way of objection, have been received. |
w
Purpose of Report
To determine Development Application No eDA0318/24 for 100 Eton Road, Lindfield to upgrade the existing telecommunications facility.
The application is reported to the Ku-ring-gai Local Planning Panel for determination in accordance with the Minister’s Section 9.1 Local Planning Panels Direction, as it is contentious development in respect of which 10 or more unique submissions, by way of objection, have been received.
THAT the Ku-ring-gai Local Planning Panel, exercising the functions of Ku-ring-gai Council, as the consent authority, pursuant to Section 4.16 of the Environment Planning and Assessment Act 1979, being satisfied that the proposed development would be in the public interest, grant development consent to eDA0318/24 for upgrade the existing telecommunications facility at 100 Eton Road, Lindfield, subject to conditions contained in the Development Assessment Report (Attachment A1). Pursuant to Section 4.53 of the Environmental Planning and Assessment Act 1979, this consent lapses if the approved works are not physically commenced within five years of the date of the Notice of Determination.
Raymond Law Senior Development Assessment Officer |
Jonathan Goodwill Team Leader Development Assessment |
Shaun Garland Manager Development Assessment Services |
Michael Miocic Director Development & Regulation |
Attachments: |
A1 |
Development Assessment Report |
|
2024/397516 |
|
A2 |
Location Sketch |
|
2025/026955 |
|
A3 |
Zoning Sketch |
|
2025/026957 |
|
A4 |
Amended Architectural Plans |
|
2025/023548 |
|
A5 |
Environmental EME Report |
|
2024/267608 |
|
A6 |
Section 60 Approval under Heritage Act 1977 |
|
2024/267607 |
Ku-ring-gai Local Planning Panel Meeting - 17 February 2025 |
GB.3 / 1 |
|
|
Item GB.3 |
S14501 |
Planning Proposal for 77 Kulgoa Road Pymble
EXECUTIVE SUMMARY
purpose of report: |
|
|
|
background: |
A formal pre-lodgement meeting was held on 1 August 2022.The Planning Proposal was submitted on 6 February 2024. The Planning Proposal was incomplete. Following the submission of revised documentation, the assessment of the Planning Proposal commenced on 19 September 2024. |
|
|
comments: |
The Planning Proposal seeks to: · Rezone the site from C4 Environmental Living to R2 Low Density Residential; · amend Minimum Lot Size from 1500sqm to 930sqm; and · amend Floor Space Ratio from 0.2:1 to 0.3:1. |
|
|
recommendation: (Refer to the full Recommendation at the end of this report) |
Purpose of Report
To refer the Planning Proposal for 77 Kulgoa Road, Pymble to the KLPP for advice as required by the Local Planning Panels Direction – Planning Proposals issued by the Minister for Planning under Section 9.1 of the Environmental Planning and Assessment Act 1979.
Background
Site Description and Local Context
The site that is the subject of this Planning Proposal is 77 Kulgoa Road, Pymble (Lot 4, DP29244). The site is a battle-axe block, which has a frontage of 4.6m to Kulgoa Road. The access handle is approximately 50m long. The main portion of the site is generally rectangular in shape. The site has a total area of 2555sqm.
The site is currently zoned C4 Environmental Living under KLEP 2015 and contains a part one/part two storey dwelling house with detached garage. The site also contains ancillary structures including a swimming pool adjoining the house and tennis court is located on the eastern portion of the site.
The portion of the site developed with the dwelling, garage and ancillary swimming pool and tennis court is relatively flat. From the eastern boundary of the tennis court the site falls steeply to the north-east.
The perimeter of the site is vegetated with a mixture of native and exotic trees. Remnant Sydney Turpentine Ironbark Forest (Critically Endangered Ecological Community) canopy trees are located along the northern and eastern boundaries of the site. The subject site is mapped as containing Biodiversity on the KLEP 2015 Biodiversity Map and mapped as Support for Core Biodiversity Lands and Biodiversity Corridor and Buffer on the KDCP Greenweb map. The subject site is not mapped as containing bushfire prone land.
Image: Aerial 77 Kulgoa Road, Pymble
KLEP 2015 Biodiversity Mapping Extract |
KDCP Greenweb Mapping Support for Core Biodiversity Lands Biodiversity corridors and buffer |
|
|
|
|
Adjacent to the northern boundary of the site are two long, narrow pieces of land comprising:
· an easement for water supply, zoned SP2 Infrastructure; and
· the Vista Street Bushland Reserve zoned C2 Environmental Conservation and owned by Ku-ring-gai Council.
The other surrounding sites are all residential, with those sites adjoining the water supply easement and Bushland Reserve being zoned C4 Environmental Living, and all others being zoned R2 Low Density Residential.
Image – Zoning Map Extract 77 Kulgoa Road Pymble and surrounding sites
Comments
The Planning Proposal seeks to amend the Ku-ring-gai Local Environmental Plan 2015 to rezone the site from C4 Environmental Living to R2 Low Density Residential and amend the development standards applying to the site as follows:
KLEP 2015 – Zoning and Development Standards – 77 Kulgoa Road, Pymble |
||
|
Existing |
Proposed |
Zoning |
C4 Environmental Living |
R2 Low Density Residential |
Floor Space Ratio |
0.2:1 (mapped) 0.24:1 (Clause 4.3(2D) |
0.3:1 |
Minimum Lot Size |
1500sqm |
930sqm |
The intended outcome of the Planning Proposal is to rezone the subject site and reduce the minimum lot size so that the site may be subdivided into two lots of approximately 1168sqm and 1391sqm in size.
The subject site is in the same ownership as the adjoining battleaxe lot, 73 Kulgoa Road which is zoned R2 Low Density Residential
Chronology of Assessment
A pre-lodgement meeting was held on 1 August 2022. The Planning Proposal was submitted on the Planning Portal on 6 February 2024. The Planning Proposal was incomplete. Revised information was submitted on 11 July 2024 and 6 September 2024. Following the payment of fees, the Planning Proposal was formally lodged and assessment commenced on 19 September 2024.
Merit
A Planning Proposal is not a Development Application and does not consider the specific detailed matters for consideration under Section 4.15 of the Environmental Planning and Assessment Act 1979. A Planning Proposal only relates to an LEP amendment and cannot be tied to a specific development. The proposed amendments need to be acceptable as an outcome on the site regardless of the subsequent approval or refusal of a future Development Application.
A Planning Proposal must demonstrate the site specific and strategic merit of the proposed amendments.
The Planning Proposal and Appendices are included at Attachments A2-A8.
The following is an assessment of the relevant merits of the Planning Proposal:
Site Specific Merit Assessment
Zoning
The Planning Proposal seeks to rezone the site from C4 Environmental Living to R2 Low Density Residential. The C4 Environmental Living zone is a residential zone which provides for low impact residential development in areas with special ecological, scientific or aesthetic values. The main permitted land use for both the C4 Environmental Living zone and the R2 Low Density Residential zone is ‘dwelling houses’, with both zones also permitting secondary dwellings.
In considering the Planning Proposal, the reason for the C4 Environmental Living zoning applying to 77 Kulgoa has been investigated, particularly given the similarity with the neighbouring battle axe site 73 Kulgoa Road which is zoned R2 Low Density Residential.
During the preparation of the Ku-ring-gai Local Environmental Plan 2015 the C4 Environmental Living zone was applied to areas ‘where a combination of ecological values and risks support greater restrictions on land uses and development’. At the time that the KLEP 2015 was prepared, the subject site was mapped as containing both biodiversity values relating to the remnant Blue Gum High Forest / Sydney Turpentine Ironbark Forest and as being Bushfire Prone Land category 1. As a result of these factors, the site was zoned C4 Environmental Living.
|
|
KLEP 2015 Biodiversity Map |
2008 Ku-ring-gai Bushfire Prone Land Map Category 1 BFPL shown in orange |
Subsequent to the C4 Environmental Living being put in place in 2015, Council’s Bushfire Prone Land Map was updated in 2017. As part of this update, the subject site was not identified as bushfire prone land. The Bushfire Prone Land Map was again updated in 2024, which resulted in further retreat of the bushfire prone land mapping in the surrounding area.
Since 2002 there have been 3 revisions of the Guide For Bush Fire Prone Land Mapping (NSW Rural Fire Service). This guideline is the basis for defining what land parcels are defined as being termed ‘bush fire prone land’. The differences in the classification of the three categories of Bush Fire Prone Land (and their associated buffers) and the spatial delineation of the landscape in terms of bush fire hazard is due to the refinement of the guidelines since 2002, particularly as to what spatial arrangements of vegetation constitute a real hazard in terms of fire behaviour and potential impact.
The latest version of the guideline gives details of how vegetation (hazard) is assessed in terms of being/not being an area of Bush Fire Prone Land. The vegetation exclusion ‘rules’ have assisted in refining the mapping – in terms of actual hazard.
In the case of 77 Kulgoa Road, Pymble the bushland tracts of Dalyrmple-Hay Nature Reserve (to the north) and High Ridge Creek Reserve (to the southeast) are the nearest defined Category 1 and 2 hazard areas and with the latest exclusion guidelines, smaller vegetation remnants and narrow corridors are now not included as Bush Fire Prone Land.
|
|
2017 Ku-ring-gai Bushfire Prone Lane Map 77 Kulgoa Road Pymble is no longer identified with any bushfire prone land mapping |
2024 Ku-ring-gai Bushfire Prone Land Map Further retreat of bushfire prone land mapping from area surrounding site. |
Given the current mapping attributes on the site and the lack of a ‘combination’ of environmental values and risks, it is reasonable to consider the proposed R2 Low Density Residential zone appropriate, consistent with the zoning of the adjoining battle axe site 73 Kulgoa Road Pymble.
Low and Mid-Rise Housing Policy – Dual Occupancy
On 1 July 2024 Stage 1 of the Low and Mid-Rise Housing (LMR) SEPP commenced which:
· Permitted dual occupancies and semi-detached dwellings on all R2 Low Density Residential zoned land via a development application; and
· Switched off the Complying Development pathway under the Codes SEPP until 1 July 2025 to allow Councils to consider an evidence based minimum lot size for their local government area. Failure to nominate a minimum lot size will result in the automatic application of a 400sqm minimum lot size as per
As the Planning Proposal is seeking to rezone the site to R2 Low Density Residential, it must now be assumed that development for dual occupancy is a permissible land use within the proposed zone.
The Complying Development pathway for dual occupancy under the Codes SEPP does not apply to battle axe lots, so any development for dual occupancy would have to be through a Development Application pathway.
Council is currently in the process of seeking feedback from the community and the Department of Planning, Housing and Infrastructure on potential options for a minimum lot size for dual occupancy development. Based on the options the minimum lot size for dual occupancy on the subject site could be between 1015sqm – 1075sqm.
Minimum Lot Size
The Planning Proposal seeks to amend the minimum subdivision lot size development standard applying to the site from 1500sqm to 930sqm. This would enable the potential subdivision of the site into two (x2) lots. The proposed 930sqm minimum lot size is consistent with the minimum lot size applying to the adjoining R2 Low Density Residential zoned sites and is considered appropriate.
Floor Space Ratio
The Planning Proposal seeks to amend the mapped Floor Space Ratio Development Standard applying to the site from 0.2:1 to 0.3:1.
Despite the mapped 0.2:1, Clause 4.4(2D) provides a slide scale calculation for land zoned C4 Environmental Living which overrides the mapped FSR. As the site is over 1,500sqm the calculation is ((250 + (0.15 x site area))/site area :1, which equates to maximum FSR of 0.24:1 currently applying to the site.
The proposed mapped Floor Space Ratio Development Standard of 0.3:1 is consistent with the Floor Space Ratio development standard that applies to the adjoining R2 Low Density Residential sites and is considered appropriate. Also noting, that despite the mapped Floor Space Ratio Clause 4.4 (2A) will apply to land zoned R2 Low Density Residential. This clause provides a sliding scale based on lot size.
More than 1,700 square metres |
0.3:1 |
More than 1,000 square metres but not more than 1,700 square metres |
((170 + (0.2 × site area)) / site area):1 |
More than 800 square metres but not more than 1,000 square metres |
((120 + (0.25 × site area)) / site area):1 |
800 square metres or less |
0.4:1 |
Biodiversity
The subject site is mapped on the KLEP 2015 Biodiversity Map due to vegetation on the site being identified as Blue Gum High Forest / Sydney Turpentine Ironbark Forest, (Critically Endangered Ecological Community), and mapped as Support for Core Biodiversity Lands and Biodiversity Corridor and Buffer on the KDCP Greenweb map.
The Planning Proposal does not seek to amend the current biodiversity mapping. Accordingly, the KLEP 2015 Biodiversity mapping and Clause 6.3, KDCP Greenweb mapping and controls, and CEEC protections will still continue to apply to any proposed R2 Low Density Residential development on the site. These protections should be manageable as the main biodiversity assets are located towards the boundaries of the subject site.
Strategic Merit Assessment
Greater Sydney Region Plan and North District Plan
The Planning Proposal is consistent with the objectives of the Greater Sydney Region Plan – A Metropolis of Three Cities, in particular:
· Objective 10. Greater housing supply
· Objective 11. Housing is more diverse and affordable
· Objective 27. Biodiversity is protected, urban bushland and remnant vegetation is enhanced
The Planning Proposal is consistent with the planning priorities of the North District Plan, in particular:
· Planning Priority N5. Providing housing supply, choice and affordability, with access to jobs, services and public transport
· Planning Priority N16. Protecting and enhancing bushland and biodiversity
Ku-ring-gai Local Strategic Planning Statement
The Planning Proposal is consistent with the following local planning priorities:
· K3. Providing housing close to transport, services and facilities to meet the existing and future requirements of a growing and changing community
· K4. Providing a range of diverse housing to accommodate the changing structure of families and households and enable ageing in place
· K12. Managing change and growth in a way that conserves and enhances Ku-ring-gai’s unique visual and landscape character
· K28. Improving the condition of Ku-ring-gai’s bushland and protecting native terrestrial and aquatic flora and fauna and their habitats
· K29. Enhancing the biodiversity values and ecosystem function services of Ku-ring-gai’s natural assets
· K31. Increasing, managing and protecting Ku-ring-gai’s urban tree canopy
Section 9.1 Ministerial Directions and State Environmental Planning Policies (SEPPs)
The Planning Proposal is not inconsistent with the State Environmental Planning Policies (SEPPs) applicable to the site. Many of these SEPPs contain detailed provisions and controls which would only apply at the Development Application stage.
The Planning Proposal is consistent with the applicable s9.1 Ministerial Direction, specifically those relating to:
· 3.1 Residential Zones
Amendments required to Planning Proposal
The assessment of the Planning Proposal has found that there are a number of amendments required to the Planning Proposal and supporting studies in order to provide more clarity prior to the public exhibition of the Planning Proposal. The amendments are generally minor editorial in nature or requests for further clarification in supporting studies and are required to ensure the Planning Proposal is in accordance with the Local Environmental Plan Making Guideline (August 2023).
The table of amendments is included at Attachment A1 which details the required amendments to be made to the Planning Proposal if Council is to support it being submitted to the Department of Planning, Housing and Infrastructure and proceed to public exhibition.
integrated planning and reporting
Theme 3: Places, Spaces and Infrastructure
Community Strategic Plan Long Term Objective |
Delivery Program Term Achievement |
Operational Plan Task |
P2.1 A robust planning framework is in place to deliver quality design outcomes and maintain the identity and character of Ku-ring-gai
|
P2.1.1 Land use strategies, plans and processes are in place to protect existing character and effectively manage the impact of new development
|
P2.1.1.2 Continue to review the effectiveness of existing strategies, local environmental plans, development controls plans and processes across all programs
|
Governance Matters
The process for the preparation and implementation of Planning Proposals is governed by the provisions contained in the Environmental Planning and Assessment Act 1979 and the Environmental Planning and Assessment Regulation 2021.
Local Planning Panel’s Direction – Planning Proposals issued by the Minister for Planning under Section 9.1 of the Environmental Planning and Assessment Act 1979 requires Council to refer all Planning Proposals prepared after 1 June 2018 to the Local Planning Panel for advice, before the Planning Proposal is forwarded to the Minister for a Gateway Determination.
Risk Management
This is a privately initiated Planning Proposal. Council needs to determine its position on the matter as to whether the Planning Proposal should proceed to Gateway Determination.
Financial Considerations
The Planning Proposal was subject to the relevant application fee under Councils 2024/2025 Schedule of Fees and Charges. The cost of the review and assessment of the Planning Proposal is covered by this fee.
Social Considerations
The amendments sought by the Planning Proposal would enable the delivery of one additional residential lot with one additional dwelling house to meet existing and future requirements of a growing and changing community.
Environmental Considerations
Remnant Sydney Turpentine Ironbark Forest (Critically Endangered Ecological Community) canopy trees are located along the northern and eastern boundaries of the site. The subject site is mapped as containing Biodiversity on the KLEP 2015 Biodiversity Map and mapped as Support for Core Biodiversity Lands and Biodiversity Corridor and Buffer on the KDCP Greenweb map.
It is considered that R2 Low Density Residential zoning is appropriate for the site, and any future development will be required to comply with the existing biodiversity protections of the KLEP, KDCP and CEEC. Future low density residential development should be manageable on the site, noting the main biodiversity assets are located towards the boundaries of the site.
Community Consultation
The Planning Proposal has not been subject to community consultation. In the event that the Planning Proposal is issued a Gateway Determination by the Department of Planning, Housing and Infrastructure the Planning Proposal would be placed on statutory public exhibition in accordance with the requirements of the Gateway Determination and Council’s community participation plan.
Internal Consultation
The assessment of the Planning Proposal has involved consultation and assessment with Council’s Natural Areas Team Leader.
Summary
A Planning Proposal has been submitted for 77 Kulgoa Road, Pymble which seeks to make the following amendments to the Ku-ring-gai Local Environmental Plan 2015:
· Rezone from C4 Environmental Living to R2 Low Density Residential;
· amend mapped Floor Space Ratio development standard from 0.2:1 to 0.3:1; and
· amend Minimum Lot Size development standard from 1500sqm to 930sqm.
The Planning Proposal has been assessed and found to have sufficient strategic and site-specific merit to enable it to proceed to Gateway Determination and public exhibition, subject to the amendments outlined in Attachment A1.
The Ku-ring-gai Local Planning Panel advise Council that:
A. The Planning Proposal, amended as per the Table of Amendments Attachment A1, be submitted to the Department of Planning, Housing and Infrastructure for a Gateway Determination.
Alexandra Plumb Urban Planner |
Craige Wyse Team Leader Urban Planning |
Antony Fabbro Manager Urban & Heritage Planning |
Andrew Watson Director Strategy & Environment |
Attachments: |
A1 |
Table of Amendments - Planning Proposal 77 Kulgoa Road Pymble |
|
2025/006335 |
|
A2 |
Planning Proposal 77 Kulgoa Road Pymble 21 August 2024 - PP-2024-1994 |
|
2025/006348 |
|
A3 |
Appendix A - Aboricultural Report - 77 Kulgoa Road, Pymble |
|
2025/006365 |
|
A4 |
Appendix A - Tree Protection Plan - 77 Kulgoa Road Pymble |
|
2025/008055 |
|
A5 |
Appendix B - Biodiversity Development Assessment Report (BDAR) - 77 Kulgoa Road, Pymble |
|
2025/006356 |
|
A6 |
Appendix C - Urban Design Outcome Study Plan of Subdivision R2 zone - 77 Kulgoa Road, Pymble |
|
2025/006351 |
|
A7 |
Appendix D - Concept Stormwater Outcome Study - 77 Kulgoa Road Pymble |
|
2025/006361 |
|
A8 |
Appendix E - Site Photographs 77 Kulgoa Road Pymble |
|
2025/006353 |
|
A9 |
Appendix D - Pre-Planning Proposal Meeting Minutes - 77 Kulgoa Road, Pymble |
|
2025/006352 |
ATTACHMENT No: 2 - Planning Proposal 77 Kulgoa Road Pymble 21 August 2024 - PP-2024-1994 |
|
Item No: GB.3 |
ATTACHMENT No: 5 - Appendix B - Biodiversity Development Assessment Report (BDAR) - 77 Kulgoa Road, Pymble |
|
Item No: GB.3 |
ATTACHMENT No: 6 - Appendix C - Urban Design Outcome Study Plan of Subdivision R2 zone - 77 Kulgoa Road, Pymble |
|
Item No: GB.3 |
ATTACHMENT No: 7 - Appendix D - Concept Stormwater Outcome Study - 77 Kulgoa Road Pymble |
|
Item No: GB.3 |
ATTACHMENT No: 9 - Appendix D - Pre-Planning Proposal Meeting Minutes - 77 Kulgoa Road, Pymble |
|
Item No: GB.3 |
Ku-ring-gai Local Planning Panel Meeting - 17 February 2025 |
GB.4 / 1 |
|
|
Item GB.4 |
S14341 |
9 town
Planning Proposal for 40 Dumaresq Street Gordon
EXECUTIVE SUMMARY
purpose of report: |
|
|
|
background: |
A formal pre-lodgement meeting was held on 9 May 2023. The Planning Proposal was submitted on 18 October 2023. The Planning Proposal was incomplete. Following the submission of revised documentation in December 2023 and February 2024 and payment of fees, the assessment of the Planning Proposal commenced on 28 March 2024. The Planning Proposal considered by the KLPP on 19 August but was deferred to obtain further clarity on the details of the proposal. Amended documentation was received on 16 December 2024 to address the Panels advice. |
|
|
comments: |
The Planning Proposal seeks to amend the Ku-ring-gai Local Environmental Plan 2015 as follows: · Rezone from R2 Low Density Residential to R3 Medium Density Residential; · Amend Height of Buildings Development Standard from 9.5m to 11.5m; · Amend Floor Space Ratio Development Standard from 0.3:1 to 0.8:1; and · Amend Minimum Lot Size Development Standard from 930sqm to 1,200sqm. |
|
|
recommendation: (Refer to the full Recommendation at the end of this report) |
Purpose of Report
To refer the Planning Proposal for 40 Dumaresq Street, Gordon to the KLPP for advice as required by the Local Planning Panels Direction – Planning Proposals issued by the Minister for Planning under Section 9.1 of the Environmental Planning and Assessment Act 1979.
Background
Ku-ring-gai Local Planning Panel 19 August 2024
The Planning Proposal was originally considered at the KLPP 19 August 2024. At this meeting it was decided:
A. That consideration of the Planning Proposal be deferred to obtain further clarity on the details of the proposal and that the Council officers prepare a further report to the Panel in consultation with the Proponent.
B. The Panel recommends that the proponent address the additional information and matters identified by Council in Attachment 10 of the Assessment Report.
C. Advisory Note:
The following matters should be considered in a further assessment:
The Panel supports the reported ambition of the planning proposal (at page 16) to resolve local drainage issues by enabling the consolidated redevelopment of Nos38 and 40 Dumaresq Street. However, further analysis is required to demonstrate the planning proposal aligns with this ambition and the flood risk considering all applicable policies on flooding, including Direction 4.3 – Flooding under Section 9.1 of the EP&A Act, KLSPS goal K43.
The Panel agrees with Council’s recommendation that the Planning Proposal should be supported by the inclusion of a high-quality documentation package including a fully developed urban design report. Concept plans should reflect the proposed land use, Height of Building (HOB) and Floor Space Ratio (FSR) outcome sought for the combined site.
Following the deferral, the proponent submitted amended documentation on 16 December 2024 to address the matters outlined in the Panels advice. A table detailing the Panels advice from the KLPP meeting on 19 August 2024 and compliance with the required amendments is included at Attachment A1.
This report has been updated to include consideration and assessment of the amended documentation submitted.
Site Description and Local Context
The site that is the subject of this Planning Proposal is 40 Dumaresq Street Gordon (Lot 1 DP1006588 and Lot 2 DP1006588). The site is generally rectangular is shape with a frontage of approximately 20m to Dumaresq Street. Lot 1 has an area of 1415.1sqm and Lot 2 has an area of 60sqm. The site has a combined area of 1475.1sqm.
The site falls steeply from each corner of the lot towards a low point approximately halfway along the western boundary. There is a localised depression through the middle of the lot, which is known to provide an overland flow path through the site for any runoff from the upstream properties.
The site is currently zoned R2 Low Density Residential and contains a part one, part two storey dwelling house, with vehicle access provided on the western boundary to Dumaresq Street.
|
|
Image: 40 Dumaresq Street, Gordon
Adjacent to the subject site to the east is 38 Dumaresq Street which currently comprises a single storey dwelling house, is in the same ownership as the subject site and is zoned R3 Medium Density Residential.
Further to the east on the corner of Dumaresq Street and Hanson Way is 34-36 Dumaresq Street which is currently under construction for 9 townhouses which are 3 storeys in height. Dumaresq Street on the eastern side of Hanson Way is zoned R4 High Density Residential and characterised 5-6 storey residential flat buildings.
To the west of the site are low density residential dwellings, and the streetscape is characterised by significant tree canopy and vegetation.
Opposite the site are sites zoned R3 Medium Density Residential, with Development Consent at 43-47 Dumaresq Street for 14 townhouses.
The subject site is located approximately 350m from the Pacific Highway and the Gordon Centre. The site is located approximately 70m from Gordon Glen, a small park on the opposite side of Dumaresq Street which contains a playground and seating.
Image: Surrounding context
Comments
The Planning Proposal seeks to amend the Ku-ring-gai Local Environmental Plan 2015 to rezone the site from R2 Low Density Residential to R3 Medium Density Residential and amend the development standards applying to the site as follows:
KLEP 2015 – Zoning and Development Standards – 40 Dumaresq Street Gordon |
||
|
Existing |
Proposed |
Zoning |
R2 Low Density Residential |
R3 Medium Density Residential |
Floor Space Ratio |
0.3:1 |
0.8:1 |
Height of Buildings |
9.5m |
11.5m |
Minimum Lot Size |
930sqm |
1,200sqm |
The objective of the Planning Proposal is to rezone the subject site to R3 Medium Density Residential so that it may be consolidated and developed together with 38 Dumaresq Street, which is in the same ownership. This would overcome the isolated status of 38 Dumaresq Street.
Chronology of Assessment
A pre-lodgement meeting was held on 9 May 2023. The Planning Proposal was submitted on the Planning Portal on 18 October 2023. The Planning Proposal was incomplete. Revised information was submitted on 11 December 2023 and 23 February 2023. Following the payment of fees, the Planning Proposal was formally lodged and assessment commence on 28 March 2024.
Merit
A Planning Proposal is not a Development Application and does not consider the specific detailed matters for consideration under Section 4.15 of the Environmental Planning and Assessment Act 1979. A Planning Proposal only relates to an LEP amendment and cannot be tied to a specific development. The proposed amendments need to be acceptable as an outcome on the site regardless of the subsequent approval or refusal of any future Development Application.
A Planning Proposal must demonstrate the site specific and strategic merit of the proposed amendments.
The Planning Proposal and Appendices are included at Attachment A2-A11.
The following is an assessment of the relevant merits of the Planning Proposal:
Site Specific Merit Assessment
Zoning – History, Interface, Isolation and Surrounding Context
The subject site is current zoned R2 Low Density Residential and is the boundary of the transition from R3 Medium Density to R2 Low Density on the southern side of Dumaresq Street. To the west downslope is also zoned R2 Low Density Residential and to the east is zoned R3 Medium Density Residential. Further to the east (opposite side of Hanson Way) up Dumaresq Street is zoned R4 High Density Residential.
The adjoining three (3) properties to the east – 38, 36, and 34 Dumaresq Street- are zoned R3 Medium Density Residential. During the preparation of the Ku-ring-gai Local Environmental Plan (Local Centres) 2012 Council considered that these sites were highly impacted by overlooking, scale and overshadowing from the adjoining high density residential development and upzoned the three sites to R3 Medium Density Residential. It was considered that the R3 Medium Density Residential zoning on these sites would enable site amalgamation and the ability to achieve a comprehensive development that would be able to mitigate the overlooking and scale impacts. It was envisioned that 38, 36 and 34 Dumaresq Street would be amalgamated as one development site.
Council has commonly used the application of the R3 Medium Density Residential zone as an interface or transition zone between areas of high density and low density. This approach results in a stepping down of development density, so as not to have a poor interface of low density adjoining high density development.
Image: Zoning Context
While it was Council’s intentions that 34, 36 and 38 Dumaresq Street be redeveloped as one consolidated lot, Development Application REV0005/19 was approved in 2020 for the construction of 9 townhouses on 34 and 36 Dumaresq Street. This approval and subsequent commencement of construction has resulted in 38 Dumaresq Street now being considered an isolated site as it does not meet the minimum lot size (1200sqm) or depth (24m) requirements for multi dwelling housing under Clause 6.6 of the KLEP 2015, and therefore unable to meet the full development potential of its R3 zoning. In granting the approval, the issue of the isolation of 38 Dumaresq Street was the subject of in-depth assessment, and it was demonstrated that there were numerous negotiation attempts and reasonable offers made to the owner of 38 Dumaresq Street.
A key justification within the Planning Proposal for the rezoning of the subject site at 40 Dumaresq Street is to enable 38 and 40 Dumaresq Street which are currently in the same ownership to be developed together for the purpose of ‘multi dwelling housing’ and overcome the isolation of 38 Dumaresq Street. The proposed rezoning of the site to R3 Medium Density Residential will allow for a better planning outcome on the site by providing for the orderly and economic development of residential land by allowing the site to be redeveloped with the adjoining property and overcome the isolation, while maintaining the local character.
Image: Adjoining isolated site and development site
Height and Floor Space Ratio
The Planning Proposal seeks to apply a height of buildings development standard of 11.5m (3 storey) to the subject site. This is the typical height of buildings development standard that is applied to R3 Medium Density zoned sites throughout Ku-ring-gai. The Planning Proposal seeks to apply a Floor Space Ratio development standard of 0.8:1 to the subject site. This is the typical Floor Space Ratio development standard that is applied to R3 Medium Density zoned sites throughout Ku-ring-gai.
The Urban Design Study submitted includes a reference scheme modelling the proposed height and floor space ratio development standards on the site.
|
|
Image: Reference Scheme Multi Dwelling Housing – Urban Design Study
The resulting development from the proposed height and FSR controls is of a scale that is sympathetic to the surrounding context, specifically the adjoining townhouse development at 34-36 Dumaresq and the low-density dwellings at 42 and 42a Dumaresq Street. In addition, the development scheme is able to achieve approximately 50% deep soil, retain significant trees across the site and allows for the integration of the overland flow path through the site.
Minimum Lot Size
The Planning Proposal seeks to apply a minimum lot size development standard of 1,200sqm to the subject site. This is the standard minimum lot size development standard that is applied to R3 Medium Density zoned sites throughout Ku-ring-gai, and this is consistent with the 1,200sqm minimum lot size required under Clause 6.6 for the development of multi dwelling housing in the R3 Medium Density.
Traffic and Transport
The Planning Proposal has the following favourable transport aspects:
· Residents in the Statistical Area of the site use public transport more for their journeys to work than the Gordon suburb as a whole.
· Based on the work destinations of current residents in nearby surrounding Statistical Areas, nearby Strategic Centres are expected to be key work destinations for future residents of the site.
· The site is located within 700m of Gordon station, which provides access to the Sydney Trains and Sydney Metro network. The demand resulting from the Planning Proposal is modest and unlikely to impact on train or platform capacity.
· The site is well positioned to take advantage of the recent opening of the Chatswood to Sydenham component of Sydney Metro, and future conversion to rapid bus line of the existing express bus service from Chatswood to Dee Why, as well as future frequent bus services between Mona Vale and Macquarie Park.
· There is a good selection of retail, health/medical, leisure/recreational and community/cultural facilities within a 10 minute walk of the site.
· Due to the modest number of additional vehicle trips expected to be generated from the site, the proposal is not expected to have significant additional impact on the operation of the intersection of the Pacific Highway and Dumaresq Street.
The following transport constraints were found with respect to the Planning Proposal:
The local cycling network in the area is largely underdeveloped, limiting local and regional cycling connectivity.
· Public Primary and High Schools are not within walking distance, although this is moderated somewhat by school buses that travel near the site.
Flood and Stormwater
The site has been identified as being impacted by the Overland Flow Flood Planning Area, and in addition the owner has stated they have experienced flooding from 34-36 Dumaresq Street. The Planning Proposal is supported by a Flood Management Report, DRAINS and HEC-RAS modelling. The report and modelling propose a swale/channel through the naturally occurring low point on the site to convey the overland flow through the property.
Flood Report notes “For the downstream neighbouring property, the proposed works (including the upsizing of the existing pipe to a Ø750mm pipe) will result in a reduced flow entering their land, at a reduced depth of flow. Even though the velocity at the most downstream section is slightly higher than the pre-development scenario, the velocity depth product is effectively unchanged at this downstream section.” (p.16) and “Given the nature of the dedicated channel, the higher velocity achieved within the dedicated space will not impose a danger on people, vehicles or buildings, as the magnitude of flow reaching the downstream property is reduced, as well as the depth of flow. The velocity depth product on the downstream section is proof that the safety for the neighbouring land is not compromised.” (p.17)
Biodiversity
The site contains Landscape Remnant mapping as well as identified Sydney Turpentine-Ironbark Forest vegetation at the rear of the site. The reference scheme and ecological reports submitted with the Planning Proposal indicate that the STIF endangered ecological community species can be retained, and that the rezoning can be accommodated without significant impact to the biodiversity.
Strategic Merit Assessment
Greater Sydney Region Plan and North District Plan
The Planning Proposal is consistent with the objectives of the Greater Sydney Region Plan – A Metropolis of Three Cities in particular:
· Objective 4. Infrastructure is optimised
· Objective 10. Greater housing supply
· Objective 11. Housing is more diverse and affordable
· Objective 14. Integrated land use and transport creates walkable and 30-minute cities
A Metropolis of Three Cities outlines that liveability incorporates access to housing, transport and employment, as well as social, recreational, cultural and creative opportunities. Provision of housing close to public transport and services and facilities improves the opportunity for people to walk and cycle to local shops and services. The proposal is consistent with these principles.
The Planning Proposal is consistent with the planning priorities of the North District Plan, in particular:
· Planning Priority N1. Planning for a city supported by infrastructure
· Planning Priority N5. Providing housing supply, choice and affordability, with access to jobs, services and public transport
· Planning Priority N6. Creating and renewing great places and local centres, and respecting the districts heritage
· Planning Priority N12. Delivering integrated land use and transport planning and a 30-minute city
The Planning Proposal will allow for additional housing supply in a location that enables good access via public transport to key strategic centres such as Chatswood, St Leonards, Hornsby and Macquarie. The Planning Proposal is in accordance with the North District Plan priorities to focus housing in locations that support the 30 minute city and provide access to jobs, services and public transport.
Ku-ring-gai Local Strategic Planning Statement
The Planning Proposal is consistent with the following local planning priorities:
· K3. Providing housing close to transport, services and facilities to meet the existing and future requirements of a growing and changing community
· K4. Providing a range of diverse housing to accommodate the changing structure of families and households and enable ageing in place
· K12. Managing change and growth in a way that conserves and enhances Ku-ring-gai’s unique visual and landscape character
· K21. Prioritising new development and housing in locations that enable 30min access to key strategic centres
· K28. Improving the condition of Ku-ring-gai’s bushland and protecting native terrestrial and aquatic flora and fauna and their habitats
The LSPS contains the overarching local planning priority regarding the provision of housing close to transport, services and facilities, and then provides additional specific detail about each centre and its suitability for additional housing and timing. The LSPS sets out that Gordon Local Centre is a Primary Centre as it contains a local railway station and bus routes on an arterial road corridor and meets the criteria for 30 minute access to a strategic centre, as well as being supported by retail services and community facilities. The timing noted in the LSPS for future housing delivery in 2021-2026, and 2026-2031. The Planning Proposal is consistent with these provisions in the LSPS.
The Planning Proposal is consistent with the principles for the location of additional housing as set out in the LSPS:
· Locate high density housing types within a 10 min walk (800m radius) of Primary and Secondary Local Centres
· Locate medium density built forms and other housing types on interface and transition areas where they function as a buffer between differing scale of building or differing land use types
· In considering areas for future medium and high density housing form, the following areas are to be avoided:
o Heritage conservation areas.
o Areas of visual or aesthetic quality and character.
o Areas within or affecting scenic and cultural landscapes.
o Areas of intact tree canopy where the built form does not sit under the canopy.
o Areas with multiple constraints including steep topography.
o Areas with environmental values.
o Areas that are bushfire prone and with evacuation risk.
o Centres with limited transport and service access until improvements are implemented.
The site that is the subject of the Planning Proposal is not constrained by heritage, scenic or cultural landscape or bushfire prone land. While the site does have intact tree canopy and environmental values, the site has capacity to accommodate additional housing and ensure future development is located outside of areas of environmental values.
Ku-ring-gai Housing Strategy and Letter of Approval Conditions
Council’s adopted Ku-ring-gai Housing Strategy provides all new dwellings to 2036 from capacity within the existing planning controls and zoning. As the Planning Proposal is seeking to upzone the site and amend the development controls to enable delivery of more housing on the site, it is inconsistent with the Housing Strategy.
The amendments sought by the Planning Proposal will enable the delivery of an addition 10 townhouse style dwellings on the site under the R3 Medium Density zoning and provisions contained in the KLEP 2015 for multi dwelling housing.
In approving the Ku-ring-gai Housing Strategy, the Department of Planning, Industry and Environment issued a number of approval conditions, one of which is:
2. Consistent with Priority K3 of the Ku-ring-gai Local Strategic Planning Statement (LSPS), Council is to commence a masterplan, or accommodate proponent-led planning proposal(s) with good planning outcomes, for Gordon, Lindfield and/or Turramurra local centres. Planning proposal(s) for these centres are to be submitted to the Department for Gateway Determination by December 2022. Where this work is not pursued by Council the Department welcomes good place-based approaches by landowner/developers.
At OMC 16 November 2021 Council resolved to reject the Housing Strategy conditions of approval. As Council has not committed to a work program, the subject Planning Proposal submitted by the landowners is consistent with the requirements of Condition 2. The Planning Proposal will enable the provision of additional housing on the site in an area that is close to public transport, services and community facilities.
Section 9.1 Ministerial Directions and State Environmental Planning Policies (SEPPs)
The Planning Proposal is not inconsistent with the State Environmental Planning Policies (SEPPs) applicable to the site. Many of these SEPPs contain detailed provisions and controls which would only apply at the Development Application stage. The Planning Proposal is consistent with the applicable s9.1 Ministerial Direction, specifically those relating to:
· 3.1 Residential Zones
· 3.4 Integration of Land Use and Transport
Low and Mid-Rise Housing Policy
From 15 December 2023 – 23 February 2024, the NSW Department of Planning, Housing and Infrastructure (DPHI) placed on exhibition an Explanation of Intended Effect (EIE) ‘Changes to create low and mid-rise housing’. Following the exhibition, DPHI released the Low and Mid-Rise Housing Policy Refinement Paper (April 2024). The following amendments are proposed to enable the delivery of additional low and mid-rise housing within NSW and the Six Cities Region:
Low Rise – Terraces and Townhouses
On land zoned R2 (low density residential) within 800m of station and nominated centres:
· terraces and townhouses up to 9.5m high and FSR 0.7:1
· manor houses up to 9.5m high and floor space ratio 0.8:1.
On all land zoned R2 (low density residential)
· Dual occupancies up to 9.5m high and FSR of 0.65:1, provided the minimum lot size is 450 square metres and a minimum 12m in width.
Mid-rise Apartment Buildings and Shop-top Housing
On land zoned R4 (high density) and R3 (medium density) within 400m of stations and nominated centres:
· Height:
o 22m high for residential flat buildings
o 24m for shop top housing
o Maximum 6 storey
· Floor Space Ratio of 2.2:1
On land within 400m-800m of stations and nominated centres:
· R3 (medium density): up to 16m high (approx. 4 to 5 storey) apartments at a floor space ratio of 2:1
Gordon local centre will be a nominated centre, and the subject site is located within 800m of the E1 Local Centre zone. Accordingly, the Low Rise provisions will apply to the subject site under the current R2 Low Density Residential zoning, and the Mid-Rise provisions will apply should the site be rezoned to R3 Medium Density Residential as sought by this Planning Proposal.
The State Environmental Planning Policy (Housing) Amendment (Dual Occupancies and Semi-detached Dwellings) 2024 (Amendment SEPP) commenced on 1 July 2024. The DPHI has advised that the other low and mid-rise housing reforms will commence sometime in 2025.
The commencement of the Low and Mid-Rise Housing Reforms will have significant impact on the Planning Proposal and outcomes on the site. Should the subject site be rezoned to R3 Medium Density Residential as sought in this Planning Proposal, the site will be able to be developed under the ‘Mid-rise’ provisions which permit a residential flat building of 22m (6 storey) and an FSR of 2.2:1 (based on the details contained in the Low and Mid-Rise Housing Policy Refinement Paper April 2024).
This will result in an inconsistent pattern of development along Dumaresq Street, Gordon with the transition from high density apartments at the top of Dumaresq Street, to medium density townhouses on 34-36 Dumaresq Street and then back to high density apartments on 38 Dumaresq Street and the subject site.
The amended Urban Design Study includes a reference scheme for a 6 storey residential flat building on the subject site under the provisions of the Low and Mid Rise Housing Policy.
Image – Reference Scheme B Residential Flat Building – Urban Design Study
The R3 Medium Density Residential zone will effectively be comparable to the R4 High Density Residential zone within Ku-ring-gai, as it will allow 6 storey residential flat buildings. There will be a disconnect between the original intention of the R3 Medium Density Residential zone to provide an interface between the R4 High Density Residential and R2 Low Density Residential.
There is considerable change in height from the current controls (9.5m) in the KLEP 2015, to the 22m permitted by the reforms.
A challenge arises at the interface of the subject site with the adjacent properties to the west – 42 and 42a Dumaresq Street – which are zoned R2 Low Density Residential and currently contain existing low density detached houses. 42 and 42a Dumaresq and other properties located to the west of the subject site zoned R2 Low Density Residential, would also be able to be redeveloped under the Low and Mid-Rise Housing Reforms utilising the low-rise provisions in order to mitigate potential impacts from the adjoining 6 storey mid-rise development. The low-rise provisions include:
· Multi dwelling housing (terraces and townhouses) with a height of 9.5m and FSR of 0.7:1
· Manor houses with a height of 9.5m and FSR of 0.7:1
Council’s Strategic Traffic Engineer has reviewed the weekday peak hour traffic generation from the R3 Medium Density Townhouse proposal vs the Mid-Rise 6 Storey apartment proposal.
Current Proposal |
|||
|
Peak Traffic Generation (vehicle trips per hour) |
Less Existing Traffic Generation (vehicle trips per hour) |
Net Peak Hour Traffic Generation (vehicle trips per hour) |
10 Townhouses (0.65 trips per dwelling) |
7 |
2 |
5 |
Low-Mid Rise Scenario
|
|||
48 Apartments (0.19 trips per dwelling) |
10 |
2 |
8 |
The impacts of the additional 3 trips during the peak hour generated by the mid-rise scenario over the current proposal would not be noticeable in any traffic modelling of nearby intersections.
It is noted that the Flood Report emphasises that a residential flat building development on the site with a covered culvert is not appropriate due to maintenance, blockage risk and lack of alternative path for surcharging water during an emergency. i.e. an open air channel is recommended. However, the Urban Design Reference Scheme for a residential flat building spans across the site and existing depression, with no open air channel. It is recommended that prior to submission to Gateway Determination that the Urban Design Study Residential Flat Building Reference Scheme to be updated to align with the recommendations of the Flood Report, by showing an open air channel.
Alternative Scenarios to the TOD SEPP
On 8 May 2024 Council resolved to commence studies and alternative scenarios around the four Transport Orientated Development Precincts – of Gordon, Killara, Lindfield and Roseville. On 30 October 2024 Council resolved to place 5 scenarios on public exhibition. The alternative scenarios examine different percentages of Heritage Conservation Area protection, different building heights and different spread and were placed on public exhibition from 15 November to 17 December 2024.
Scenario 3b – Preserve, Intensify and Expand looks at preserving all HCA’s within 400m of stations and expanding the spread of new dwellings from 400m to 800m. As part of this scenario building heights ranging from 5-8 storeys are extended down Dumaresq Street, from Hansen Way to Vale Street.
|
|
Image: Public Exhibition Version Council Alternative Scenario 3b Gordon
Council will consider community feedback at a meeting in March 2025. If there is support for a preferred scenario, Council may request the NSW Government for approval to formally exhibit it to replace the TOD policy. The exhibition will be a further opportunity for the public to comment.
Recommended Amendments prior to Gateway Determination
It is recommended that prior to submission to Gateway Determination that the Planning Proposal documentation be updated as follows:
· Table addressing S9.1 Flooding in Flood Report, Planning Proposal and Urban Design Study to be updated to change reference from Floodplain Development Manual (2005) to Floodplain Risk Management Manual (2023)
· Urban Design Study Residential Flat Building Reference Scheme to be updated to align with the recommendations of the Flood Report, by showing an open air channel.
integrated planning and reporting
Theme 3: Places, Spaces and Infrastructure
Community Strategic Plan Long Term Objective |
Delivery Program Term Achievement |
Operational Plan Task |
P2.1 A robust planning framework is in place to deliver quality design outcomes and maintain the identity and character of Ku-ring-gai
|
P2.1.1 Land use strategies, plans and processes are in place to protect existing character and effectively manage the impact of new development |
P2.1.1.2 Continue to review the effectiveness of existing strategies, local environmental plans, development control plans and processes across all programs |
Governance Matters
Local Planning Panels Direction – Planning Proposals issued by the Minister for Planning under Section 9.1 of the Environmental Planning and Assessment Act 1979 requires Council to refer all Planning Proposals prepared after 1 June 2018 to the Local Planning Panel for advice, before the Planning Proposal is forwarded to the Minister for a Gateway Determination under Section 3.34 of the Environmental Planning and Assessment Act 1979.
Risk Management
Financial Considerations
Social Considerations
The amendments to the height of buildings and floor space ratio sought by the Planning Proposal would enable the delivery of new dwellings in order to meet the existing and future requirements of a growing and changing community:
· approximately 10 townhouse style dwellings on a consolidated development site with the adjoining property 38 Dumaresq Street under the proposed R3 Medium Density development standards of 0.8:1 and 11.5m
· approximately 48 apartments on a consolidated development site with the adjoining property 38 Dumaresq Street under the provisions contained in the Low and Mid-Rise Housing Reforms.
Environmental Considerations
The site has been identified as being impacted by the Overland Flow Flood Planning Area, and in addition the owner has stated they have experienced flooding from 34-36 Dumaresq Street.
The site contains Landscape Remnant mapping as well as identified Sydney Turpentine-Ironbark Forest vegetation at the rear of the site. The reference scheme and ecological reports submitted with the Planning Proposal indicates that the STIF endangered ecological community species can be retained, and that the rezoning can be accommodated without significant impact to the biodiversity.
Community Consultation
Internal Consultation
The assessment of the Planning Proposal has included internal consultation with Council staff with expertise in planning, natural areas, traffic and transport and Urban Design has informed the recommendations of this Report.
Summary
A Planning Proposal has been submitted for 40 Dumaresq Street Gordon. The Planning Proposal seeks to:
· Rezone from R2 Low Density Residential to R3 Medium Density Residential
· Amend Height of Buildings Development Standard from 9.5m to 11.5m
· Amend Floor Space Ratio Development Standard from 0.3:1 to 0.8:1
· Amend Minimum Lot Size Development Standard from 930sqm to 1,200sqm
The objective of the Planning Proposal is to rezone the subject site to R3 Medium Density Residential so that it may be consolidated and developed together with 38 Dumaresq Street, which is in the same ownership. This would overcome the isolated status of 38 Dumaresq Street.
The rezoning to R3 Medium Density Residential and the associated development standards which would enable a townhouse style development are considered to demonstrate site specific and strategic merit.
The forthcoming Low and Mid-Rise Housing reforms complicate the Planning Proposal as they will have significant impact on the development outcomes on the site. Should the subject site be rezoned to R3 Medium Density Residential as sought in this Planning Proposal, the site will be able to be developed under the ‘Mid-rise’ provisions which permit a residential flat building of 22m (6 storey) and an FSR of 2.2:1.
That that Ku-ring-gai Local Planning Panel advise Council that:
A. Prior to submission to Gateway Determination that the Planning Proposal documentation be updated as follows:
1. Table addressing S9.1 Flooding in Flood Report, Planning Proposal and Urban Design Study to be updated to change reference from Floodplain Development Manual (2005) to Floodplain Risk Management Manual (2023)
2. Urban Design Study Residential Flat Building Reference Scheme to be updated to align with the recommendations of the Flood Report, by showing an open air channel.
B. That the amended Planning Proposal be submitted for a Gateway Determination.
Alexandra Plumb Urban Planner |
Craige Wyse Team Leader Urban Planning |
Antony Fabbro Manager Urban & Heritage Planning |
|
Attachments: |
A1 |
Review Table Amended Documents KLPP - 40 Dumaresq Street Gordon |
|
2024/366174 |
|
A2 |
Planning Proposal 40 Dumaresq Street Gordon (December 2024) |
|
2025/022448 |
|
A3 |
Appendix A - Concept Plans 40 Dumaresq Street Gordon |
|
2024/255202 |
|
A4 |
Appendix B - Shadow Diagrams 40 Dumaresq Street Gordon |
|
2024/255209 |
|
A5 |
Appendix C - Urban Design Report 40 Dumaresq Street Gordon |
|
2025/022450 |
|
A6 |
Appendix D - Arboricultural Impact Assessment (December 2024) 40 Dumaresq Street Gordon |
|
2025/022444 |
|
A7 |
Appendix E - Tree Relocation Methodology (Magnolia Mature) - 40 Dumaresq Street, Gordon |
|
2024/213532 |
|
A8 |
Appendix F - 40 Dumaresq Street, Gordon - Ecological Assessment Report (29 Nov 2024) |
|
2025/022445 |
|
A9 |
Appendix G - Flood Management Report (December 2024) 40 Dumaresq Street Gordon |
|
2025/022447 |
|
A10 |
Appendix H - TRAFFIC REPORT 40 Dumaresq Street Gordon |
|
2024/255220 |
|
A11 |
Appendix I - Site Survey - 40 Dumaresq Street, Gordon |
|
2024/255238 |
ATTACHMENT No: 6 - Appendix D - Arboricultural Impact Assessment (December 2024) 40 Dumaresq Street Gordon |
|
Item No: GB.4 |
ATTACHMENT No: 7 - Appendix E - Tree Relocation Methodology (Magnolia Mature) - 40 Dumaresq Street, Gordon |
|
Item No: GB.4 |
ATTACHMENT No: 8 - Appendix F - 40 Dumaresq Street, Gordon - Ecological Assessment Report (29 Nov 2024) |
|
Item No: GB.4 |
ATTACHMENT No: 9 - Appendix G - Flood Management Report (December 2024) 40 Dumaresq Street Gordon |
|
Item No: GB.4 |